Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Landfill Scale House (Zemel Road)
Last Updated: 02/23/2024 Category: County Facilities Current Phase: Construction
The scale house at the Zemel Road Landfill is currently a trailer nearing end of expected usable lifecycle. Additionally, not compliant with the County's Ordinance of not utilizing trailers as permanent operations. The project would move the physical location of the scale house and its ancillary functions of a convenience center and household hazardous waste. The project will also streamline the flow and control of traffic in and out of the landfill.
Placida West Boat Ramp Expansion
Last Updated: 02/23/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Planning and Project Approval
A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.Riverside Boat Ramp Replacement
Last Updated: 02/23/2024 Category: Parks And Recreation Current Phase: Design Development
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Family Services Center - Phase 2
Last Updated: 02/23/2024 Category: Sales Tax Funded Category: County Facilities Current Phase: Turnover and Closeout
Completed the Human Services integrated services model with Phase 2 following the completion of Phase 1. Phase 2 enabled youth services to be constructed as a separate building on the campus. In Phase 2 of the FSC project, the Human Services' staff offices were constructed along with critical shared support facilities, maker space, and expanded services.Ainger Creek Boat Ramp Replacement
Last Updated: 02/23/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval
This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent restroom facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.Port Charlotte Beach Recreation Center
Last Updated: 02/23/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
Design a new recreation center that will serve the current needs of rental venue for events, as well as community facilities for sailing and regatta events.Last Updated: 02/22/2024 Category: Roadway Current Phase: Construction
The purpose of this project is to resurface Charlotte County roadways in the following districts: Greater Port Charlotte, Pirate Harbor, Woodland Estates, Road and Bridge.Last Updated: 02/22/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Planning and Project Approval
GC Herring Phase II design and construction. Redevelopment of the park will include necessary amenities for a community park as identified in the Parks and Recreation master Plan.Mid-County Library Hurricane Repairs
Last Updated: 02/22/2024 Category: County Facilities Current Phase: Planning and Project Approval
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.